DB Breweries wood energy feasibility study
Research and reports
20 July 2009
This study assesses the suitability of various-sized wood-fired boilers for providing some or all of the Brewery's process steam needs.
It also assesses the possibility of using an absorption chiller to provide some or all of the sites cooling requirements using wood energy. Three boiler scenarios are considered. The two most attractive scenarios are described in detail, both delivering an IRR of 7 - 8%.


